RAMEDA 6th October WWTP

Wastewater

RAMEDA 6th October WWTP

Sanitary and industrial wastewater station control with SCADA operation, level measurement and timed pump and valve sequences.

Wastewater SCADA and Control

Automation Scope

System Components

SCADA operation screens
Control panels and DOL starters
Level measurement sensors
Timed pump and valve sequences

Scope of Work

Automatic/manual SCADA operation setup
Sanitary and industrial station screen planning
Level measurement and backwash logic coordination
Panel documentation and control sequence support
Project Gallery

Operator Screens, Panels and Process Details

Project Outcome

A wastewater automation package covering operator screens, pump/valve sequences and instrumentation-based control for plant operation.

Discuss Similar Scope
Scroll to Top