Wastewater
RAMEDA 6th October WWTP
Sanitary and industrial wastewater station control with SCADA operation, level measurement and timed pump and valve sequences.
Wastewater SCADA and Control
Automation Scope
System Components
SCADA operation screens
Control panels and DOL starters
Level measurement sensors
Timed pump and valve sequences
Scope of Work
Automatic/manual SCADA operation setup
Sanitary and industrial station screen planning
Level measurement and backwash logic coordination
Panel documentation and control sequence support
Project Gallery
Operator Screens, Panels and Process Details
Project Outcome
A wastewater automation package covering operator screens, pump/valve sequences and instrumentation-based control for plant operation.